Ashrae Carry Over- Analyzing The Potential For Condensate Carry-Over From An Inlet Cooling Coil

By Thomas C. Tillman, PE Presented at Ashrae-2003

Thermal Energy In Raleigh, NC – Modernizing Infrastructure Using An Inventive District Cooling Solution Financed Via Performance Contract

By Richard B. Beversdorf, Pepco Energy Servicesand John S. Andrepont, The Cool Solutions Company Presented at IDEA Annual Conference

Weather-Rated Economics Of Gas Turbine Installations – A Call For An Alternate Rating Point

By Thomas C. Tillman, PE & Peter Armstrong Presented at Power Gen International

Case Study For Retrofit Of Turbine Inlet Cooling In Batam, Indonesia

By Gary Hilberg, PE and Fazil Erwin Alfitri, President Director, PT. Medco Power Indonesia Presented at Power Gen Asia Conference

Comparison Of Power Enhancement Options For Retrofit To Combined Cycle Power Plants, Phase 2 Report

By Thomas C. Tillman, PE Presented at Power Gen International

Comparison Of Power Enhancement Options For Combined Cycle Power Plants In Humid Environments

By Gary Hilberg, PE and Thomas C. Tillman, PE Presented at Power Gen Asia

The Impact Of Air Conditioning Design On The Power Plant

By Christopher M. LandryPresented at Power Gen Middle East

Variable Primary Flow Chilled Water Systems: Potential Benefits & Application Issues

By William P. Bahnfleth, Ph.D., P.E. and Eric Peyer Air-Conditioning and Refrigeration Technology Institute

Comparison Of Power Enhancement Options For Greenfield Combined Cycle Power Plants

By Thomas C. Tillman, PE Presented at Power Gen International

Asset Optimization Of New Power Projects With Gas Turbine Inlet Air Cooling

By Christopher M. Landry and Thomas C. Tillman, PE Presented at Power Gen Middle East

Advances In Energy Efficiency, Capital Cost, And Installation Schedules For Large Capacity Cooling Applications

By Thomas L. Pierson, Jerry Koch, and John S. Andrepont Case Study presented at IDEA Conference in